Cost of running the NorESM modelΒΆ

Here we provide information on the cost of running the NorESM model for standard experiment configurations.

PES:

Total processor count for simulation

Cost:

Model cost, processing hours per simulated year

Thrput:

Model throughput, simulated years per day

STime:

Simulated time in (Y)ears, (M)onths or (D)ays

RTime:

Model runtime in hours:minutes

Output:

Storage size required for model output

Experiment

Grid

PES

Cost

Thrput

STime

RTime

Output

NHIST NHIST

f19_tn14 f19_tn14

1280 1280

1487.53 1454.69

20.65 21.12

10Y 10Y

11:37 11:21

151G 151G

Experiment

Grid

PES

Cost

Thrput

STime

RTime

Output

NOINYOC NOINYOC NOIIAOC20TR NOIIAJRA NOIIAJRA NOIIAJRAOC20TR

T62_tn21 T62_tn14 T62_tn21 TL319_tn14 TL319_tn14 TL319_tn14

512 512 512 512 512 512

57.37

272.20

68.32

550.56 634.72 688.06

214.21

45.14

179.87

22.32 19.36 17.06

10Y 10Y 10Y

1Y

10Y 10Y

1:07 5:19 1:20 1:04

12:24 13:26

22G

193G

25G

9.8G 175G 186G